How to Collect Existing Plant Data for Revision Projects?

  • Blog
  • How to Collect Existing Plant Data for Revision Projects?
How to Collect Existing Plant Data for Revision Projects?
Share

How to Collect Existing Plant Data for Revision Projects?

Table of Contents

  • Why Data Matters in a Revision Project
  • Preliminary Review of Existing Documents
  • How Reliable Are Old Drawings?
  • Field Measurement and Equipment Identification
  • Collecting Process Data
  • Completing Missing Information
  • Ranking the Data Sources
  • Organising Measurement Records
  • Data Approval and the Freeze Point
  • Conclusion

Revision projects are started to add new equipment to an existing plant, change a line or increase capacity. In such projects the design often begins not from a blank page but from older documents found on site. Whether that data can be trusted determines every decision that follows.

Why Data Matters in a Revision Project

When existing plant data is wrong or incomplete, new connections do not fit on site, pipe routes clash and capacity calculations come out incorrect. These errors are often discovered during installation and lead to costly rework.

For this reason, data collection before a revision should be planned as part of the design. It should be clear from the start which data is needed and how it will be verified.

Preliminary Review of Existing Documents

The first step is to make an inventory of the existing documents for the plant. P&IDs, isometric drawings, equipment lists, datasheets and earlier project reports belong on this list. The date, revision and owner of each document should be recorded.

The preliminary review shows which documents are current and which are old or incomplete. This information defines the scope of the later site work.

How Reliable Are Old Drawings?

Old drawings usually show the first state of the plant but may not include later changes. Revisions may not have been incorporated, and some lines may have been moved or closed. The gap between a drawing and the field can only be found by checking.

The date and purpose for which a drawing was prepared are important criteria in judging its reliability. An old drawing should not be accepted as definitive until it has been verified.

Field Measurement and Equipment Identification

Measurement on site is the most reliable complement to the documents. Pipe diameters, equipment elevations, connection points and distances should be measured and recorded. The reference of each measurement point should be clearly defined.

Equipment can be identified by reading tags and recording photographs. The information on the tag should be compared with the document, and any differences noted.

Collecting Process Data

Process data is needed to assess the effect of the revision. Temperature, pressure, flow and fluid properties should be taken from operating records or measurement systems. The operating condition to which each value belongs should be stated.

Seasonal changes and different production scenarios can affect how representative the data is. Data covering a period is a sounder basis than a single reading.

Completing Missing Information

Not all information can be measured on site. Some data may exist only in old design reports or in the manufacturer's archive. These gaps should be tracked on a list of missing information, each with a source and a responsible person.

Where an assumption must be made, it should be documented clearly and verified later. Unstated assumptions are among the most common risks in revision work.

How to Collect Existing Plant Data for Revision Projects?

Ranking the Data Sources

Data from different sources can conflict. In that case a rule should decide which source takes precedence. In general a recent site measurement is treated as more reliable than an old drawing, but each case should be assessed on its own.

The ranking rule should be written down at the start of the project and known to the whole team.

Organising Measurement Records

Collected data should be kept in one orderly environment. Each measurement should be recorded with its date, location, method, person and source. This order makes it easy to use the data during design.

Organised records also form the basis of the as-built revision. Field changes should be traceable within the record.

Data Approval and the Freeze Point

Before design starts, the existing data set to be used should be formally approved. After approval the data is frozen, and later changes are handled through a controlled process. This point makes clear which data the design team is working with.

The freeze is one of the most important control points in a revision. Any difference between the frozen data and the field condition should be recorded as a change request.

Conclusion

In revision projects, existing plant data is collected through a preliminary review of documents, field measurement, process data and tracking of open items. When the ranking of data sources and the approval point are defined, the design rests on a reliable foundation.

SS Proje supports revision projects with field measurement and as-built documentation. The scope and data acceptance criteria should be set for each project according to the contract and the project specification.